Showing posts with label Dumpster Diving 9 - Blue Springs Road. Show all posts
Showing posts with label Dumpster Diving 9 - Blue Springs Road. Show all posts

Thursday, April 1, 2021

Dumpster Diving 9 - Blue Springs Road - the Quilt



Dumpster Diving 9 - Blue Springs Road is finished.

53" wide x 68" long



Started in mid-2019 when I impulsively bought
a fat quarter bundle of blue and white "Bequest" fabrics.

After multiple design considerations, 
I settled on SPRING by Valori Wells
using the fabrics from that bundle 
plus blues and yellows from my stash.

Once the long long long strips of segments were sewn
and laid out on the design wall, that plan changed again.

The top was completed in late July 2020.


Dumpster Diving 9 - Blue Springs Road 
was quilted with my liberated echo daisy fans
using Glide thread in Sky.

I used the last of the backing from Copacetic
to make the binding for DD 9.




As I continue my effort to FMQ and finish
my backlog of waiting tops,
I'm stitching out a sample of each design I use.

I started at the bottom with the original design
used on Copacetic at the left.

By the third motif, I modified the design
making it more fluid to stitch.



As I worked my way across the next to the last pass on DD 9,
I mistakenly stitched a second echo around the center hook.

Instead of taking it out, I used that variation to finish the quilt.

Then I stitched myself a small sample so I'd remember
that I like this version more than the single echo-ed center.

* * *

ADDED LATER in response to questions:

I think the rows appear to be so “straight” 
because I don’t stress over their exact linear placement. 

(hence the reason I begin the name 
for each of my FMQ designs
with the word "liberated")

Once I stitch the first row working left to right
along the lower edge of the quilt, 
 I cut my threads and return to the left 
to begin the second pass/row.  
The second row nests down into the first row 
and so on and so on as I work my way up the quilt.

By the time I get to the upper edge, 
one side of the last row or two 
is inevitably closer to the top  than the other - 
but the overall effect is still that the rows 
are moving horizontally across the quilt.

* * *

FMQ goals for April include

(waiting on fabric because I changed my mind
about the protective border and binding)


and





Quiltdivajulie
-----------------------------------------------
“I never get tired of the blue sky.”
Vincent Van Gogh/ Stephen King

Wednesday, March 31, 2021

More Progress



While Max was still set up with the lilac Glide thread
I went ahead and quilted this runner for my sister.

12" x 60" 




When I pieced the back for Dumpster Diving 7 - Respite
I knew it would be larger than needed . . . 

As it ended up, this runner became a bonus project.




Quilted with my liberated all over fans,
this will be headed to Michigan later in the week.




Dumpster Diving 9 - Blue Springs Road
has been pin basted ready for quilting.




I tried several different threads in yellows and blues
before choosing this spool of Sky.

It will work beautifully on both the top and the back.

Next step will be to stitch out a sample since 
I haven't used the fans with daisies in quite a while.



Quiltdivajulie
-----------------------------------------------
“I’m just too colorful for words.”
Clairee in Steel Magnolias

Monday, July 27, 2020

Dumpster Diving 9 - Blue Springs Road - the Flimsy



After days of sewing long seams 
in between other activities,
this quilt top is finally sewn together.




The oversize top currently measures
55" wide x 74" long (untrimmed).




It looks quite crooked in the photos
but in reality it is surprisingly straight.

Once quilted, I'll square it to roughly 50" x 63"

(don't hold your breath - that won't happen anytime soon)




This particular project was conceived
sometime in mid-2019.

I have lost track of the design changes
but am delighted with my final choice -
such a traditional color combination
but such a non-traditional layout.

* * *

Renovation update:

Final wall repairs are in process
and then the last of the wall painting
can be completed.

Flooring is in transit.

Once it arrives,
DH will do the floor leveling
that needs to be done.

A few days after that
the laying of the new floor can begin.

One step at a time.


Quiltdivajulie
-----------------------------------------------
“One of the sincerest forms of respect is actually listening to what another has to say.”
Bryant H. McGill

Tuesday, July 21, 2020

Incremental Progress


In addition to the two quilts-in-progress
there are three more in my sewing studio.

Left side - the first few Otsego Revisited blocks

Right side and quilt rack -
Dumpster Diving 9 - Blue Springs Road
partially sewn together

Table top - Heliophilia HRTs paired ready to sew together.

(and yes, that's also the way my brain feels these days;
scattered between too many thoughts, worries, and ideas)



A few days later, the HRTs were sewn and pressed.

105 yellow and gray
44 yellow and green

(I won't need all of them but with a scrappy project
I like to have extras for layout options)




Also on my short list are these two pillowcases.

A very special young man 
will be turning 4 all too soon.



Shifting gears a bit, back in 2013
Cherie (one of my book's SSOBB barn builders)
gave me these scrappy leftovers when



I was in the midst of making Open Ended
as part of Vicki's Fractured QAL
so I used that technique
along with some of my greens and yellows
and Cherie's scrappy squares
to make this happy scrappy quilt top.

Cherie recently posted about this project's
new forever home - click HERE
to read a feel good story.

* * *

The move-out from younger son's apartment
and the renovation of our bonus room 
into his new living quarters are also progressing.

All but a few tiny bits of carpet are gone
and the staples have been removed 
from the OSB flooring boards.

The ceiling is freshly painted
and new lighting has been installed.

Both of the closets have been emptied and painted
with new LED lighting has been added.

The walls are about fifty percent painted.

New wood laminate flooring is on order
and expected by early next week.

Inch by inch we're getting things done.


Quiltdivajulie
-----------------------------------------------
“The whole culture is telling you to hurry, while the art tells you to take your time.  ALWAYS listen to the art.”
Junot Diaz

Wednesday, July 1, 2020

Blue Springs Road - Change of Plans




Once the ver-r-r-r-r-r-r-ry long strip had been cut
into forty-five 70-ish inch length strips 
(with a whole lot of the long strip left over)
I randomly pinned the lengths on the design wall.

Hmmmm . . . . not so sure about this.




The inspiration design seemed like such a good idea
but when translated into dumpster diving mode,
the blue-on-white (instead of the original's solid white)
just didn't do anything for me.




These two fabrics were the original backing plan.



Feeling totally underwhelmed,
I wondered what would happen if I used some of the
long leftover strip to cut more 70-ish inch lengths
to fill in where the blue-on-white had been?



Oh, yes - this is much better.




And instead of the blues-on-white backing options
I am going to use this wonderful blue yardage.

Nothing like having the quilt tell you what it wants to become!


* * *

And then there are the yards and yards
 of no-longer-needed-blue-on-white strips.

I thought briefly about sewing them together 
into made-fabric and die cutting  
for another as-yet-unknown project.

But that didn't excite me much.

I also thought about packing the many strips 
into a USPS Priority Mail envelope 
and sending them to a new home .

Anyone excited by that possibility?

NOTE ADDED LATER:

I drew names out of a hat from those
who responded today and
the blue and white strips are going to . . . 
Linda Swanekamp.


Quiltdivajulie
-----------------------------------------------
“Too often we underestimate the power of a touch, a smile, a kind word, a listening ear, an honest compliment, or the smallest act of caring; all of which have the potential to turn a life around.”

Leo Buscaglia

Monday, June 29, 2020

Dumpster Diving 9 - Blue Springs Road Begins



There were so many different things
I really should have worked on over the weekend,
but this project  has been calling to me.

So it became my late week/weekend focus.




One pair at a time the blue on white segments
were sewn together again and again.

This group of ten 70-ish inch strips 
will be rearranged to eliminate most of the situations 
where the same fabric ends up next to itself. 




This is the second "white" column 
comprised of an additional four lengths.

(my design was inspired by "Spring" - a free
Valori Wells/Robert Kaufman download found HERE)




Then I started on the blue and yellow segments.

I first sewed pairs of segments.

Those pairs were paired with other pairs and sewn together.

This is what the top of the large boxful looked like.




And this is the side view of that same box.




Before sewing the shorter multi-segment strips together,
 I just HAD to pull out a few put them on the design wall.




Finally all those short multi-segment lengths were 
sewn together into one ver-r-r-r-r-r-r-r-r-r-r-r-ry long strip.

Next step will be to cut 
the uber-long strip into 70-ish inch lengths.

The quilt top's planned dimensions
 are 50-ish x 64-ish inches.

No matter how careful I am, the long narrow strips
twist and bow during the sew-together stage
and again during the quilting process.

So I've learned the hard way to make the top wider and longer
so there's plenty of room to square things up later.

* * *

I started the set up of the new computer Saturday afternoon.

It is working but there are a lot of elements
that still need to be dealt with 
like connecting to the printer,
updating files, moving documents, and more.

The good news though
is that the new computer
is faster by a lot AND
it loves the new Blogger.

That makes me a happy camper.




Quiltdivajulie
-----------------------------------------------
The Listening Song
(sung to the tune of Frere Jacques)

Eyes are watching.
Ears are listening.
Lips are closed.
Hands are still.
Feet are very quiet.
You should really try it.
Listening well.
Listening well.

From Ms. Cathy - 
our grandson’s Pre-K 3 reading teacher


Friday, May 29, 2020

Dumpster Diving Prep Work




There has been a lot (!!) of computer time the past few days
with massive edits for the organization
where I serve as Board President
and another group of edits/thoughts/suggestions

In addition to all that focused brain work,
 I've felt lethargic/distracted and unable to sit and sew.

So I've been cutting fabric into little pieces instead.

June's color for the  Rainbow Scrap Challenge is PINK.

(much more fun than May's dark green)



I'll make one block with the darker pinks in the first photo
and the second block with these lavender bits.

Dumpster Diving 11 - Mischief Maker 
will be colorful if nothing else.




Next I tackled the boxes of fabrics and scraps 
gathered for Dumpster Diving 10 - Blue Springs Road.

After I piece the two RSC blocks shown above,
I want to work on Blue Springs Road's 
bits and pieces as leaders-enders while I
piece the remaining spiderweb blocks for Feisty.

But that meant the gathered long strips 
had to be cut into smaller bits first.




I had planned to use black on white in the design
but as I sorted through the box of blues
I discovered more than enough of these
blue and whites - so I'm going to use them instead.




The stash of yellow strips were also cut into smaller pieces.

This particular Dumpster Diving quilt 
will feature longer segments to play into the feel
of the free download called Spring.




Here are all of the segments ready and waiting
for me to pin them into pairs
that can be kept beside my machine 
for easy leader-ender stitching.




I also tackled the stacks of pink and aqua yardage
that had been set aside for Dumpster Diving 10 - Do Tell.

My goal was to cut 3-5 strips from each of the fabrics
and then get them back on the shelf where they belong.

Mission accomplished for this one.

(I won't sub-cut and worry with  pinning pairs for Do Tell
until that process is completed for Blue Springs Road)




After making the various RSC placemats using 1.5" strips
along with the RSC Dumpster Diving 11-Mischief Maker blocks,
I had a pile of leftover pieces that didn't work

I started putting those random leftovers in one box.

It didn't take long to realize there would, indeed,
be a thirteenth quilt in my Dumpster Diving series.

I've named No. 13 Surplus, for obvious reasons.



Here's a look at the accumulated strips (so far).

Oh yeah, I'm obsessed . . .

(you can click on the labels at the end of this post
to read previous posts for any of these projects)


Quiltdivajulie
-----------------------------------------------
“The most basic of all human needs is the need to understand and be understood.  The best way to understand people is to listen to them.”   

Ralph Nichols

Friday, March 20, 2020

Enough is Enough - Decisions Made




At some point in time I decided I would make 
a series of twelve Dumpster Diving quilts.

Since then I've made myself dizzy with ideas.

This past week I decided enough was enough.

Dumpster Diving 9 - Blue Springs Road
will feature these blue and white strips cut from
an impulsively purchased fat quarter bundle.




I'll mix in some yellows and possibly bits of gray
and use the free Spring design 
by Valori Wells for Kaufman Fabrics.




I'll use this yardage for DD-9's backing.




The color palette for Dumpster Diving 10 - Do Tell
was inspired by the thought of 
a bouquet of full blown pink peonies in 
one of my grandmother's vintage aqua mason jars.

(name inspired by an award-winning
 lush pink peony variety from the 1940s)

I've gathered these pieces from the resource and crumb boxes
ready to be run through the die cutter when the time comes.




This is the yardage I chose for DD 10's backing.




Dumpster Diving 11 - Mischief Maker
is underway as one of my RSC 2020 projects.

January's blocks are here.

February's blocks are here.

March's blocks are waiting to be made.

The yardage above (right) will be DD11's backing
and the yardage on the left will be it's binding.




Dumpster Diving 12  - Journey's End
will feature black and white and red.

I have a design in mind
but need to do a bit more planning
between now and the time this one begins.

EDIT ADDED LATER -
DD 12 - Journey's End did not happen.
The red and black strips eventually became
an Etcetera Quilt known as Drama Queen,
which was donated to Mercyful Quilts 
during Hands2Help 2022.  

You can use the Drama Queen label at the end
of this post to see the posts for that quilt.



And this will be the backing for DD 12.

* * *

Meanwhile . . . 

is still waiting to be quilted

and

is ready and waiting for block construction.

* * *

It will obviously be a while
before the rest of this series is worked on
but at least I can quit thinking about how
I'm going to finish out this series of 12 quilts.

Decisions made.



Quiltdivajulie
-----------------------------------------------
“There will be a few times in your life when all your instincts will tell you to do something, something that defies logic, upsets your plans, and may seem crazy to others.  When that happens, you do it.  Listen to your instincts and ignore everything else.  Ignore logic, ignore the odds, ignore the complications, and just go for it.”
Anonymous