The quilt top of the month for March
will be Dumpster Diving 5 - Catharsis.
After two design changes, a third one is in process
and I'm finally ready to rock and roll
to get this to flimsy stage by 3/31.
My number one quilting project for March
will be the 70273 Project's Quilt No. 697
from last fall's Davies Manor quilt show.
The top currently measures 56" x 77"
and commemorates 86 lives.
I also need to put away all of the quilts
from the cancelled trunk shows.
They were heavy before and they're still heavy
so I'm dealing with them in very small groups
since my stamina is still recovering.
When I teach at John C. Campbell Folk School in September,
(class project photo pending on their website)
I want to take 12-14 journal covers to sell in their Craft Shop.
The outsides are assembled and linings have been chosen.
Next steps will be to assemble the covers and quilt them.
Hopefully they'll all be ready for the final steps
by the end of the month.
If not, these might spill over into April.
I'll be teaching Lynne's Liberated Birds
at our local quilt shop on March 18 and 25.
(day and evening classes)
AND I need to prep enough quarter square triangles
to assemble forty blocks for my RSC Mosaic project.
This month's color is GREEN - which should
look really good against the blue backgrounds.
* * *
And in my non-quilting world,
I need to prepare for and chair my first
Davies Manor Association Board meeting,
and get things ready for our tax guy.
One thing at a time . . .
Quiltdivajulie
-----------------------------------------------"Set realistic goals, keep re-evaluating, and be consistent."
Venus Williams






5 comments:
Good goals as you rebuild your stamina. Have fun with the quilt classes.
That's quite the list, Julie! I'm SEW glad that you are feeling better. Between that and your wonderful organizational skills, I'm sure you will be checking items off the list left, right, and center!
Wait a minute.. I see PINS! Handsome bird. Wanna borrow Flight of Fancy for your class? But I need it back for my class at MQX Manchester on April 10.
You have quite a lot going on here Julie! I like your idea of setting a goal of one quilt top for the month, not a bad idea when you're still in recovery mode - take it easy. I'm shifting between four projects and gone into squirrel mode after the mailman delivering Anna Maria Horner fabric!!
So sorry you weren't feeling well and am glad you are on the mend. That's a lot of quilts to put away, and I remember all the organizing that went into packing them in the first place. I wonder if you could have stored them in a way so they would be ready for your next trunk show.
Post a Comment